The fee should be paid at the first plan submission to BCA. Consult the relevant technical departments and incorporate their requirements onto the building plans.Obtain written permission from the Urban Redevelopment Authority (URA).

Before applyingīefore applying for building plan approval, the QP needs to do the following: For example, building plans for a warehouse or factory may be submitted by an Architect or a Professional Engineer, but plans for a retaining wall must be submitted by a Professional Engineer. The appropriate QP for the different types of building works are listed in the Third Schedule of the Building Control Regulations.